Free HOA Architectural Request Form
Every exterior change in a managed community starts with a request form. A good form collects what the committee actually needs up front. A bad one creates weeks of back-and-forth. Here is a free template and a walkthrough of every section.
Download the template
Download the template — a plain-text architectural change request form you can copy into any word processor, shared doc, or board management platform. It covers owner info, project details, materials, contractor info, a site-plan area, timeline, neighbor notification, and a committee-decision section at the bottom.
The full template
Below is the complete form. Each section is explained afterward.
========================================================================
[ASSOCIATION NAME]
ARCHITECTURAL CHANGE REQUEST FORM (ARC / ACC)
Free template from The HOA Guide — thehoaguide.com
========================================================================
Date of submission: __________
Application number (office use): __________
------------------------------------------------------------------------
SECTION 1 — OWNER INFORMATION
------------------------------------------------------------------------
Owner name(s): __________
Phone: __________
Email: __________
Mailing address (if different from property): __________
------------------------------------------------------------------------
SECTION 2 — PROPERTY INFORMATION
------------------------------------------------------------------------
Property address: __________
Unit / lot number: __________
------------------------------------------------------------------------
SECTION 3 — PROPOSED CHANGE
------------------------------------------------------------------------
Type of modification (check all that apply):
[ ] Fence or wall [ ] Paint / exterior color
[ ] Roof / roofing material [ ] Landscaping / hardscaping
[ ] Deck / patio / porch [ ] Solar panels
[ ] Shed / outbuilding [ ] Windows / doors
[ ] Driveway / walkway [ ] Lighting / fixtures
[ ] Other: __________
Detailed description of proposed change:
________________________________________________________________
Reason for the change:
________________________________________________________________
------------------------------------------------------------------------
SECTION 4 — MATERIALS, COLORS, AND DIMENSIONS
------------------------------------------------------------------------
Materials to be used (brand, type, grade):
________________________________________________________________
Color(s) — include manufacturer name and color code:
________________________________________________________________
Dimensions (height, width, length, square footage):
________________________________________________________________
Attachments:
[ ] Color samples [ ] Product spec sheets
[ ] Photos of current condition
[ ] Photos or renderings of proposed change
------------------------------------------------------------------------
SECTION 5 — SITE PLAN / SKETCH
------------------------------------------------------------------------
[ ] Site plan / sketch is attached
(Show property lines, existing structures, and location of
proposed change with measurements.)
------------------------------------------------------------------------
SECTION 6 — CONTRACTOR INFORMATION
------------------------------------------------------------------------
[ ] Owner will perform the work (no contractor)
[ ] Licensed contractor will perform the work
Contractor name: __________
License number: __________
Phone: __________
Insurance on file: [ ] Yes [ ] No
------------------------------------------------------------------------
SECTION 7 — PROJECT TIMELINE
------------------------------------------------------------------------
Estimated start date: __________
Estimated completion date: __________
Total estimated cost: $__________
------------------------------------------------------------------------
SECTION 8 — NEIGHBOR NOTIFICATION
------------------------------------------------------------------------
Neighbor 1:
Name / Address: __________
Notified: [ ] Yes [ ] No
Concerns: [ ] None [ ] Yes — see attached
Neighbor 2:
Name / Address: __________
Notified: [ ] Yes [ ] No
Concerns: [ ] None [ ] Yes — see attached
------------------------------------------------------------------------
SECTION 9 — OWNER ACKNOWLEDGMENT
------------------------------------------------------------------------
By signing, I acknowledge I have read the architectural
guidelines, will not begin work until I receive written
approval, and accept responsibility for permits, code
compliance, and any damage to common areas.
Owner signature: ______________________ Date: __________
========================================================================
COMMITTEE USE ONLY
Decision: [ ] Approved [ ] Approved with conditions [ ] Denied
Conditions / reason: _______________________________________
Committee signature: ___________________ Date: __________
========================================================================
Section-by-section walkthrough
Owner and property info (Sections 1-2)
Start simple. Name, contact info, and the property address tie the request to a specific lot. If your community has unit or lot numbers, include that field so the committee can cross-reference the property map.
Proposed change (Section 3)
The checkbox list speeds up sorting. Committees that review dozens of requests per quarter can triage by category before reading the details. The free-text description field is where the owner explains exactly what they want to do. “New fence” is not enough. “Six-foot cedar privacy fence along the south property line, replacing the existing four-foot chain-link fence” tells the committee what they are actually approving.
Materials, colors, and dimensions (Section 4)
This section prevents the most common source of disputes after approval. When a form says “paint the house gray,” the committee pictures one shade and the owner buys another. Require the manufacturer name and color code. Ask for product specification sheets on roofing, fencing, and any structural material. Attach photos of the current condition so the committee can see what changes.
Site plan (Section 5)
A rough sketch showing where the change sits relative to property lines, existing structures, and common areas saves the committee a site visit in many cases. For larger projects like pools or outbuildings, you may want to require a professional survey or plot plan.
Contractor info (Section 6)
If the owner is hiring a contractor, capture the license number and confirm insurance is on file. Some associations require contractors to carry a minimum level of liability insurance before working on the property. If your community has that rule, add the minimum amount to this section.
Timeline (Section 7)
Set expectations for start and finish dates. Open-ended construction creates noise, debris, and frustrated neighbors. A stated timeline also gives the committee a trigger for follow-up if the project stalls.
Neighbor notification (Section 8)
This section is optional but valuable. When adjacent neighbors know about a project before the committee meeting, objections surface early. That gives the owner a chance to adjust the plan and gives the committee fewer surprises at review time.
Owner acknowledgment (Section 9)
The signature block confirms the owner has read the guidelines and agrees not to start work until they receive written approval. This protects the board later if the owner begins an unapproved project. It also reminds the owner to handle municipal permits on their own.
Committee decision section
The bottom of the form is for committee use only. Record the decision, any conditions, and the date the owner was notified. Keep completed forms in the association’s records permanently. Approved requests are part of the property’s modification history and may be relevant during resale or future disputes.
How to customize this form
Every community is different. Here are the most common adjustments:
- Add community-specific categories to the checkbox list. If your community gets frequent requests for basketball hoops or holiday decorations, add those.
- Reference your architectural guidelines by section number in the acknowledgment block so owners know exactly which document to read.
- Set attachment requirements for larger projects. Some committees require two contractor bids, a professional site plan, or a drainage study.
- Add a fee field if your association charges an application or review fee.
- Include a re-inspection checkbox if your community inspects completed work against the approved plan.
What happens after the form is submitted
Most CC&Rs give the committee 30 to 60 days to respond. Some state laws set a deadline too. If the committee denies the request, it should cite the specific guideline the proposal does not meet. Vague denials invite challenges.
If a homeowner skips the form and makes changes without approval, the board can typically require them to undo the work at their own expense. For more on that situation, see our guide on whether an HOA can force architectural changes.
Keep completed forms on file
Approved requests become part of the association’s permanent records. Future boards, property managers, and buyers during resale may all need to verify that a modification was properly approved. A well-organized archive of completed forms is one of the easiest ways to avoid disputes years after the work is done.
For more board documents and downloadable forms, visit our free HOA templates page.
Frequently asked questions
What is an HOA architectural request form?
It is a standardized form homeowners submit to the architectural review committee (ARC or ACC) before making exterior changes to their property. The form collects project details, materials, colors, contractor information, and a timeline so the committee can review the request against the community's architectural guidelines.
What changes require an architectural request?
Most HOAs require approval for any visible exterior change — fences, paint colors, roofing, landscaping, solar panels, sheds, decks, windows, and doors. Some also require approval for changes visible from common areas or neighboring properties. Check your CC&Rs and architectural guidelines for the specific list.
How long does an HOA have to respond to an architectural request?
Timelines vary by state and by your CC&Rs. Many governing documents give the committee 30 to 60 days to respond. Some state laws impose a deadline, and a few states treat silence as automatic approval if the committee fails to respond within the stated period. Check your CC&Rs and state statute for the exact timeline.
Can the HOA deny an architectural request?
Yes, but the denial must be based on the published architectural guidelines or CC&Rs, not personal preference. Most states require the committee to provide a written explanation of the denial and cite the specific standard the proposal does not meet. Arbitrary or discriminatory denials can be challenged.
What happens if a homeowner makes changes without approval?
The HOA can typically require the owner to undo the change at their own expense, issue fines, or both. Unapproved modifications are one of the most common sources of HOA disputes, which is why a clear request process benefits everyone.
This guide is general information, not legal or financial advice. Your association's governing documents and your state's statute control — confirm specifics with a licensed professional.